Ambarlı Combined Cycle Power Plant (816 MW)

 

Place İSTANBUL / TURKEY
Customer EÜAŞ General Directorate
Services Construction Supervision Services
Multi - Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)
Construction Management
Design Type Basic Design, Detail Design
Contract Date

10.11.2008

Completion Date

21.11.2013

Information About the Project

PROKON Engineering and Consultancy Inc, EKON Industry construction & Trade Inc. – PROKON Manufacturing Joint Venture (EPP JV) undertook Ambarlı Fuel Oil Power Plant Units 4 & 5 Conversion to Dual Fueled Combined Cycle Plant and Rehabilitation Project on EPC basis, awarded by Electricity Generation Co. (EÜAŞ) General Directorate on 10th of November 2008. Pre-trial run, 60 days trial run and performance tests have been completed succesfully for both units and Provisional Acceptance of the plant was achieved on 21 November 2013.

 

For the first time, a Turkish engineering and contracting group undertook a Turnkey construction of a power plant project in Turkey by using state of the art technology. In the scope of project, the total output for two units was increased from 270 MW to 820 MW, firing system was converted to work with both natural gas and diesel fuel (dual fuelled), environmental effects were adapted to European Union criterias, the plant efficiency was increased from 34% to 56%. PROKON-EKON Group of companies has successfully completed the Ambarlı-2 Natural Gas Combined Power Plant.

Prokon provided the following services under the scope of Contract;

- Basic and detail engineering services,
- Construction Management
- Construction Supervision Services