Hasanoğlan Cement Plant     (2500 T/D)

 

Place ANKARA / TURKEY
Customer ÇİMPOR YİBİTAŞ
Services Multi - Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)
Design Type Basic Design, Detail Design
Contract Date

18.09.2007

Completion Date

05.09.2009

Information About the Project

The scope of the project is the turnkey design and construction works of clinker production line having 2500 tons/day in existing clinker grinding facility in Ankara-Elmadağ, Hasanoğlan.

 

PROKON Mühendislik ve Müşavirlik A.Ş. has undertaken the general design, system balance, material flow diagrams and determination of the necessities about the process-mechanical-electrical subjects of the units under the scope of the project, and also provided the architectural, mechanical, electrical, structural steel and reinforced concrete structure and infrastructure design.

 

The following structures and units are designed by PROKON:

  • Raw Material Transport to Storage
  • Clay Crusher
  • Clay Transport to Storage
  • Clay Storage (5.000 tons)
  • Raw Material Storage (10.500 tons)
  • Raw Material Reclaiming
  • Raw Mill Hoppers and Raw Mill (185 tons/hour)
  • Homogenization Silo Feeding
  • Clay Reclaiming
  • Homogenization Silo (4.000 tons)
  • Preheater Feeding
  • Preheater
  • Raw Mill Dedusting
  • Rotary Kiln
  • Cooler
  • Cooler Dedusting
  • Cooler Discharge
  • Secondary Crusher
  • Cement Additive Storage (15.400 tons)
  • Clinker Silo (70.000 tons)
  • Clinker Silo Discharge
  • Cement Additives Reclaiming
  • Cement Mill Hoppers
  • Coal Storage (8.000 tons)
  • Coal Reclaiming
  • Coal Mill (17,6 tons/hour